Internal Flat Dripping Tube Production line

Internal Flat Dripping Tube Production line

original price: 100 000 USD
Shanghai, China
Shanghai, China
Company
86-21-38726398
EMILY HE
Contact person

Basic Information

Basic Technical Parameters for the Internal Flat Dripping Tube Production line 1. List of dripping tube specifications to be produced: Tube DiameterSpecificationsφ16φ20Wall Thickness0.2 -0.9mm0.4-0.6mmWall Thickness Tolerance0.2±0.03mm0.9±0.10mm0.4±0.05mm0.6±0.10mm 2. List of extruding moulds to be provided: φ16mmφ20mmWall ThicknessQuantity of mouldsWall ThicknessQuantity of moulds0.2mm1 set0.4mm1 set0.4mm1 set0.6mm1 set0.6mm1 set0.9mm1 set 3. The assembly line is provided with well-equipped and effective configuration, is not only capable of making the dripping tube with embedded flat dripper, but also making the buried tube with embedded flat dripper. Station Type Tile Type Buried Type Maximum production speed: Tube wall thickness = 0.2mm: For emitters with Tile type, normal speed = 120m/min For emitters with station type, normal speed = 120m/min Tube wall thickness = 0.9mm: Max speed = 40m/min 5. Height of assembly line’s centerline 1000mm 6. Direction of the assembly line: from right to left 7. Unit packing length: 500mm, 1000mm, 2000mm/roll 8. Gross power of equipment: 135 KW 9. Total Installation length of equipment: 34 m 10. Total weight of equipment: about 9000kg 11.Delivery: 180 days from receipt of the deposit 12. Payment terms: 30% T/T as downpayment and 70% before delivery 13.Guarantee: 1 year.

Delivery terms and packaging

Packaging Detail: 1. The goods are packed in accordance with requirements of the manufacturing plant and standards of the Chinese People's Republic.2. Each place be fixed in accordance to the particularities of the goods. The package should provide protection from moisture, vibration, corrosion and other effects, as well as meet the package requirements during transportation by sea and land transport at a long distance.3.Each package has the following marking applied by waterproof paint on two opposite side in English Delivery Detail: 180days from receipt of down payment
Port: Shanghai

Payment term

Documents Against Payment

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1

    Дата события:

    12.10.2016 - 18.10.2016
    Catalog
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product